Showing posts with label how-to. Show all posts
Showing posts with label how-to. Show all posts

2.21.2011

Involuntary Bathroom Remodeling Part II

In my last post, I discussed the suddenly urgent need to completely redo our downstairs bathtub/shower, and the accompanying demolition.  With everything demo'd to dry wood, I had to contemplate rebuilding everything to support the new tub and shower enclosure.

The first order of business was figuring out what tub to put in the space.  The old tub was a 60" jetted "drop-in" that, you will recall, (1) didn't have working jets, (2) wasn't properly supported by the framing, and (3) didn't fit into the 57" space--the tub protruded three inches into the closet in the adjoining room.  Kendra and I decided we would buy a 54" tub instead, which is harder to find than a standard 60" tub.  We finally settled on a 54" tub at Menard's, primarily because it was available without special ordering.

This still left us with a size problem -- a 54" tub to go in a 57" space.  The best solution I could think of was to build a three-inch shelf out at the top of the tub.  This meant more carpentry (ugh)* but seemed very doable.  Since 2x lumber is actually 1.5", that means I just needed to nail a couple 2x8 to the framing to create the shelf.  It all seemed very easy, until Kendra mentioned that she'd like to install shower doors in the finished space, instead of a shower curtain.  Now, my simple shelf project turned into a new wall projecting three inches out from the old wall.  Ugh, more carpentry.

*The reason I say "ugh" is not because I hate carpentry, it's just that I'm really bad at it.  Driving a nail usually is a two- or three-take process for me.  Which makes me hate carpentry.

I set to work reconstructing the space so that we could set the tub.  First, I needed to reinforce the floor joists, which had significant (although not catastrophic) water rot, so I sistered some 2x8s to the existing joists.  Underneath the bathroom is crawlspace, which made the work more difficult in that I was flat on my back the whole time, yet also easier in that I didn't need to reach straight over my head to work.  Due to the bathroom being located on an exterior wall, I was able to rest one end of the 2x8s on the sill plate, which should make them hold better (I think).   After reinforcing the joists, I cut a piece of OSB board to fit the opening in the floor and screwed it to the joists.

After a little bit of framing to correct the hole in the wall the old tub was shoved into, and then installing two 2x8s to create the proper width for the tub alcove, it was time to install the tub.  I cut and fastened a 2x4 ledger board on the back wall to support the tub.  Then  I enlisted Kendra's help to lift the tub into place.  It took quite a bit of coaxing, shoving, and pushing, but we finally got the tub set on the floor.  I doubt we had a quarter-inch of space to spare.  I used some shims to level the tub, and then we were set.

The tub snugly in place.  You can see the new framing at both the right and left-hand sides of the tub.
After getting the tub in, I turned my attention to the new, 3" deep wall I would need to build out to accommodate our future shower doors.  I decided I would attach horizontal 2x4s to the existing studs, then attach vertical 2x4s on top of that to run the length of the new "wall."  This successfully narrowed the tub alcove from 57" to 54", and resulted in a plumb-enough new structure for installing the cement board.

The cement board was surprisingly easy to work with, although there was some drama along the way.  First, I needed to clean up some of the wiring by removing the switch and wires that worked the nonfunctioning jetted tub.  In the switch's place, I installed a GFCI outlet, located in the same electrical box as the switch for running the exhaust fan.  It doesn't really makes sense to have an outlet in that particular spot, but I didn't know what else to put in the box.  I guess this will leave a power source in case we want to put in a 42" TV right across from the toilet.

After the wiring, I called and had Cooter's Plumbing come over and replace some of the old PVC pipe that ran to the tub and shower with PEX pipe.  They also installed the new shower valve and made the drain connections.  With the wiring and plumbing done, it was time to cover the walls.

I attached 4 mil plastic sheeting on top of the lathe board to act as a waterproof barrier to the framing underneath.  I decided to install the cement board on the long wall first, because it would require the least cutting and let me practice my technique before moving on to the more delicate pieces.
One wall down, two to go!
I found the board easy to cut and work with, but my efforts were not without problems.  After hanging the first piece--the one on the top in the picture above--I realized I had forgotten to cut out the opening for the exhaust fan.  Luckily I was able to punch out an opening with the use of a utility knife and cold chisel.  It added some work, but not an ungodly amount.

Yesterday, after a couple weeks of no progress, I was finally able to hang the rest of the cement board.  Here are a couple shots; this picture shows a straight-ahead view:


And here is a photo showing the new 3" wall:


As of today, we are almost ready to start tiling.  I still need to mortar the cement board joints, and finish the perimeter with joint compound.  And we still don't have the tile yet, although it's supposed to come in this week.  After two months of no downstairs tub, and I'm guessing 40 hours of labor, we are getting close to finishing this project.

3.23.2008

Hanging a Door in 3 Easy Steps!

It seems like I've been posting exclusively about doors for about 2 months now. Well, loyal readers, I can proudly say that we have a new door on the upstairs bathroom! On Saturday, Max stayed all day at his Nanni's, so Kendra and I took that opportunity to knock out a bunch of home improvement projects, including the new bathroom door. Here's a step-by-step in case any of you are contemplating a similar project.

Step 1: After realizing that there is a 3-inch-gap between the existing bathroom door and the floor (no joke), and realizing that the existing bathroom door is originally from the hall closet, remove the existing bathroom door and hang it on the hall closet (now a laundry room).

Step 1(a): Okay, then you need to find a door to put on the upstairs bathroom. There are a ton of old doors hanging around, surely one of those will fit, right?

Step 1(a)(i): Nope, none of the other doors seem to fit. They are either too short or too long.

Step 1(a)(ii): After measuring every "spare" door in the house twice, locate a door that seems to be the proper dimensions. Since it is from an old closet, you can probably just live without the door on the closet until you buy a new door many years in the future. Pause and admire your resourcefulness.

Step 1(b): Haul replacement door upstairs to the bathroom. realize that you don't have the proper hinges to install on the frame, so steal hinges from another closet door that is rarely used.

Step 1(c): Hang replacement door in bathroom door frame. Swing door closed, and realize that the replacement door is about 1/4" too wide for the frame, so the door will not close.

Step 1(c)(i): Argue with your wife, since she is the primary user of the upstairs bathroom, and now doesn't have the ability to close the door. Blame it on someone/thing else. Do not admit fault under any circumstances.

Step 1(c)(ii): Proclaim that you will fix the problem as soon as possible. Consider nominating yourself for husband of the year.

Step 2: Two weeks later, measure door frame for trip to Lowe's to buy new door. Rather than take the written measurements with you to Lowe's, just remember that you need a 32" door.

Step 2(a): Once you get to Lowe's, remember that your door frame is an odd measurement and that your door will accordingly need to be cut. Realize that Lowe's will cut the door for you and save you the trouble. Remember that you left the precise measurements at home.

Step 2(a)(i): Call your wife and have her measure the doorway. Make sure, though, that you have the good tape measure with you, so that your wife has to use a seamstress's tape measure. Tell her to measure inside the frame, and let you know the smallest measurement.

Step 2(a)(ii): When you call your wife, make sure you call her when she already has her hands full dealing with your 14-month-old son. This will make her very happy.

Step 2(b): Have Lowe's cut your door according to the measurements relayed from your wife.

Step 2(b)(i): Prime and paint the door (or, talk your wife into doing it).

Step 2(c): Carry the door upstairs to place it in the door way and make sure it fits.

Step 2(c)(i): The f***ing door doesn't fit.

Step 2(c)(ii): Argue with your wife over whose fault it is that the door doesn't fit. Do not admit fault under any circumstances.

Step 2(c)(iii): Realize that when you told your wife to let you know the smallest measurement, she did exactly as you asked and measured between the stops on the inside of the frame, making the door 1/2" too narrow.

Step 2(d): For probably the 10th time, MEASURE THE INSIDE OF THE DOOR FRAME. For probably the 11th time, MEASURE THE INSIDE OF THE DOOR FRAME. Go to Lowe's with the measurements, have them cut a new door, and bring it home.

Step 2(d)(i): Prime and paint the new door.

Step 3: Block out the whole day to plan for the install of the door.

Step 3(a): Place the new door in the frame; it appears to fit. Measure the location of the hinge mortises on the frame, and mark the corresponding locations on the door.

Step 3(a)(i): Chisel the mortises into the door.

Step 3(a)(ii): Realize that you chiseled on the inside of the door, but the hinges attach on the outside. Go ahead and chisel mortises all the way across the side of the door.

Step 3(b): Attach hinges, and hang the door. Hold your breath as you close the door. Exhale in relief when the door fits perfectly.

Step 3(c): Install an old rim lock and doorknob on the door.

Step 3(c)(i): Mark the location on the frame where the catch for the rim lock will need to be installed. Cut out the notch in the frame, and attach the catch with screws.

Step 3(c)(i)(A): Close the door, and realize that the catch sticks out JUST enough so that the door won't close properly. Consider arson as a viable home improvement option.

Step 3(c)(i)(B): Remove the catch, and shave off a bit more of the frame so that the catch and lock work properly.

Step 3(c)(ii): Use wood filler in the old screw holes used for attaching the catch.

Step 3(c)(iii): Wait for two hours for the wood filler to dry.

Step 3(c)(iv): Install catch with two screws.

Step 3(d): Swing door closed, and listen with relief when you hear that beautiful "click." Consider yourself a poor man's Bob Vila.

And that's it! Remember, with just three potential replacement doors, one month's time, the purchase of several new tools, no fewer than two domestic disputes, and about a dozen man-hours, you too can install a new door into an existing frame. It really is as easy as it sounds!

2.08.2008

Plasma

We are still going through all the fun that you encounter when you move -- forwarding mail, changing addresses, and setting up utilities. Yesterday, the satellite TV guy came, and hooked up our service. This is the first time we have had cable in about 4-5 years, so it's a bit of a change for us. The good part is that we will finally take full advantage of our HD plasma tv. We've had the tv for 3 years now, but--without cable--we were only pulling 5-7 of the local HD channels over-the-air. Now, thanks to DirecTv, we have 20+ channels in full HD goodness.

Since we have cable now, I thought it would be a good idea to try to mount our plasma to the wall. I had done this before in the urban highrise, but with the plaster walls at the country estate it was going to be a little more complex. Here is my step-by-step guide on how to mount a plasma tv, Joe-style.

Kendra and I already decided the TV was going in the corner of the living room by the pocket doors. There's a cable jack on that wall, so we are covered there. I even flexed my home improvement muscles and ran a new telephone wire up from the basement for the DirecTv service. There's no outlet there, but I am planning to add one into an existing cut-out. So far, so good.

Next, I used my new stud finder to find two studs. I'm attaching the wall mount directly to the studs with lag bolts, so I drilled four pilot holes, then attached the mount. Thankfully, it came out level.
Next, I took a utility knife and cut through the plaster to make two holes: one for the cords to go into the wall behind the tv, and one for the cords to come out of the wall and into our various components.

Then, I took a pocket saw and cut through the lath:

With my cable holes finished, I took two electrical boxes and cut out the backs using tin snips. I could have just ran the cables through the open holes, but I want to finish the holes out a bit, which ultimately proved to be my undoing. Here's one of the electrical boxes I used.

Mounting the box was tricky. One of my holes was cut perfectly -- I just slid the box in and it fit very snugly. It's not secured, but I don't think that's necessary right now. For the other one, though, the plaster crumbled a bit as I was cutting, so it didn't fit quite so snug. I had to rig it up using a toggle bolt I found in my toolbox. That keeps it in place, but it's got some play in it.

Next, I ran the cords through holes and electrical boxes:


And this, loyal readers, is where things went to hell. I went to install the switch plates I purchased at Menard's. I purchased oversized plates, thinking they would allow more room for the cords. But, come to find out, oversized plates do not fit standard electrical boxes. Shit. Now I'm stuck with a bunch of cords dangling from the walls, and my plasma tv sitting pathetically on its stand. There's no way I'm mounting this thing, only to have to take it down again to put regular-sized switch plates on.

Back to Menard's, I guess. I suppose I'll keep my TV on an entertainment stand for now, like some kind of barbarian.


11.06.2007

Hardware Spa Day, Revisited

After the painted hardware enjoyed a relaxing 24-hour soak in the crockpot, I took a nylon brush and started scrubbing. I think the results speak for themselves.

Before the soak:

And after the soak:


Even though the "crockpot" method removed most of the paint, it took a little more elbow grease than I had hoped. It was pretty effective at removing newer latex paint, but older finishes were a bit more stubborn. Overall, I would recommend this as a good way to remove paint from metal without worrying about harsh chemicals. This Old House has step-by-step instructions for this procedure.